The project has proven that it is possible to simultaneously incorporate the needs of operating a hospital and to care for the environment.
The building of the pavilion, with five storeys and one underground level and a total floor area of over eight thousand square meters, began in February 2017 and the first patients were treated there 19 months later.
The use of DELTABEAM® Composite Beam allowed a structure to be created with large spans and small slab thicknesses. Thanks to the chosen structural design the building has a lower volume and a higher use value than conventional buildings of the same type.
Also thanks to construction without visible beams the elevation of all storeys is lower, saving more than 40 centimeters on a single floor. In a six-storey pavilion the use of beams from Peikko shortened the total height for almost two and half meters.