Spar Supermarket Muldenstraße, Linz, Austria

  • Byggnadstyp:
  • Affärsbyggnader
Hel skärm Stänga

For the Spar Supermarket it was necessary to have a column free span line of 12 meters, which was solved using hollow-core slabs. The entrance side support of the hollow-core slabs was solved with DELTABEAM® Composite Beams as a slim floor construction.

Fakta om projektet

Utvecklare:
Spar AG, Salzburg
Byggentreprenör:
Jos. Ertl, Linz
Huvudkonstruktör:
Heinzel und Partner, Linz
Leveransår:
2013
Färdigställandeår:
2013

Lösningar vi tillhandahöll

Günther Pock

Günther Pock

Vertrieb & Anwendungsberatung West

Mob. +43 664 381 74 05
[email protected]