The high-quality standards of the project were met by utilizing the remarkable BESISTA® tension rod systems in the construction of the PricewaterhouseCoopers (PwC) office building.
The slender tension bars and rod anchors provided by BESISTA® play a vital role in stabilizing the facade construction, harmoniously integrating with the delicate glass assembly. To ensure utmost reliability and cost-effectiveness, BESISTA® directly supplied the tension rod systems to the facade contractor.
Furthermore, the construction project highlights the exceptional pre-tensioning capability of the BESISTA® tension rod system. Each tension rod system underwent a pre-tensioning process of 180 kN, utilizing the advanced BVS-230 pre-tensioning system developed by BESISTA®.