K.S.C.C. Pipe Rack, Shuaiba, Kuwait

  • Byggnadstyp:
  • Energibyggnad
Hel skärm Stänga

In 2009 Peikko participated to a remarkable project in Kuwait; the construction of a precast pipe rack for an ethylene glycol plant. The fast and reliable connections were secured by Peikko's bolt and column connections.

 

Fakta om projektet

Utvecklare:
The Kuwait Olefins Company (K.S.C.C.)
Byggentreprenör:
Foster Wheeler Contract
Leveransår:
2009

Lösningar vi tillhandahöll

Radovan Endel

Radovan Endel

General Manager

Mob. +971 50 279 2215
[email protected]