Eikenott, Gland, Switzerland

  • Byggnadstyp:
  • Bostadshus
  • Parkeringsplatser
Hel skärm Stänga Street View

Peikko provided an efficient construction method for Eikonott Gland. Speed and technically advanced details convinced the total contractor Losinger-Marazzi to use Peikko's Column Connection solution. Solution consisted of HPKM®-Column Shoes and HPM® Anchor Bolts which were used in oval shape columns. 

Peikko's Column Shoes were helpful in speeding up the whole construction process. Now building seems almost like a LEGO-game.

Bertrand Faucherre, Didier Bourqui

Fakta om projektet

Storlek på projektet:
20 000 m2
Våningar:
4
Byggentreprenör:
Losinger-Marazzi
Prefableverantör:
Bétontec
Leveransår:
2012
Färdigställandeår:
2014

Lösningar vi tillhandahöll

Gregor SCHABRUN

Gregor SCHABRUN

Geschäftsführer

Mob. +33 (0)6 40 75 85 34
[email protected]