City Electrical Factors (CEF) IT and Marketing Office, Durham, UK

  • Byggnadstyp:
  • Kontorsbyggnader
Hel skärm Stänga Street View

For the new CEF Date, IT and Marketing Centre the architects Faulkner Brown wanted a “technologically cutting-edge building”

A kit of parts approach was taken and 90nr DELTABEAM®s were incorporated into the design along with Peikko Column Shoes & Anchor bolts. DELTABEAM® Composite Beams providing a slim floor and flat soffit also interfaced with precast floor units which incorporated combined heating & cooling system, creating a Thermally Active Building System (TABS). The frame was delivered the 11-week contractual period.

The new CEF headquarters also secured the 2019 RIBA Northeast Building of the Year Award.

Läs mer down-arrow.png

Fakta om projektet

Storlek på projektet:
2100 m2
Våningar:
2
Utvecklare:
CEF Ltd
Byggentreprenör:
PCE Ltd
Huvudkonstruktör:
Curtins
Arkitekt:
FaulknerBrowns
Leveransår:
2016